Redmud Green Energy are currently seeking expressions of interest for a proposal to build a Redmud Green Energy Solar Farm at the address of 35 Claxton Road in Cadell.

The overall costs for the site, including all network charges for necessary infrastructure upgrades, site preparation and construction, administrative fees and commissioning fees for the proposed 212kW Redmud Green Energy Solar Farm are:

$417,380.00 +GST

Each individual Share (1%) in the Unit Trust associated with the Redmud Green Energy Solar Farm at 35 Claxton Road in Cadell is equal to:

$4,173.80 +GST

Please note: Shares are available in lots of 5 or greater, and are limited to a maximum of 50 shares per individual, company or organisation. Registering your interest does not guarantee shares will be allocated to you, or that shares are available at the time of you submitting your details. 

If you would like to register your interest as an investor in this project, please fill out your details below (even if you have provided your details to us previously).

Promoter Redmud Green Energy
info@graphick.com.au
Address
Lot 41 Sturt Highway
Paringa
South Australia
Australia
5340
Promoter campaigns Click here to see other campaigns by this promoter
Campaign creator has disabled public viewing of donations

2017-03-20

Campaign end on

2017-03-20

Campaign created on

 $ 417,380.00
raised of  $ 417,380.00
100.00%
No
Days left
100.00%
Funded
 
This campaign is closed on: 2017-03-20

Address

Head Quarters
Lot 41 Sturt Highway, Paringa, SA, 5340

PO Box
PO Box 677, Renmark, SA, 5341

Contact Info

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Phone: 0417 865 178